|
|
|
|
|
|
| STRUCTURES |
| INFRASTRUCTURES |
| STRUCTURES |
| INFRASTRUCTURES |
| Vehicular |
| Pedestrian |
| Underpass |
| Inspection |
| STRUCTURES |
| INFRASTRUCTURES |
| STRUCTURES |
| INFRASTRUCTURES |
| Corridors |
| Streetscapes |
| Alignment Studies |
| Intersections |
| STRUCTURES |
| Retaining Walls |
| Culverts & Drainage |
| Signage & Identity |
| Skate Parks |
| INFRASTRUCTURES |
| STRUCTURES |
| Recreation & Entertainment |
| Structural Glass & Facades |
| INFRASTRUCTURES |
|
Van Bibber Creek Trail Crossing at Ward Road Bear Creek Underpass at Foothills Parkway Elmer's Twomile Truscott Drive Underpasses at SH 82 |
Projects - Infrastructures
Elmer's Twomile Creek Underpass at Iris Avenue
LORIS provided complete engineering services for this federally funded 83-ft. long, 20-ft. wide underpass crossing Iris Avenue in west Boulder. The underpass structure is a combined-use facility for path users and creek flow. Geometry is very tight on the north side of the project, which required close coordination with a homeowner's association for location of retaining walls and trail access points. Several utilities within the corridor further complicated the design. High groundwater and the existing streambed elevation required that a lift station be used to accommodate drainage. The project also included on-site wetlands mitigation.
Client: City of Boulder
|
|||
|
About Loris | Projects | Contact | Home |
||||
|
|