Cemetery Lane

St. Vrain Greenway

Burlingame Trail

Two Rivers Greenway Master Plan

Aspen Highlands Trail

Lefthand Creek Greenway

3rd Avenue Entryway

Skunk Creek Multi-use Path

Clear Creek Canyon Trail

Little Dry Creek Trail

 

 

 

 

Projects - Infrastructures
Trails and Paths: Paths and Greenways





3rd Avenue Entryway
Longmont, Colorado

 

LORIS provided complete engineering services as a subconsultant to Wenk Associates for 1.8 miles of multi-use path along 3rd Avenue. The purpose of this project was to enhance off-street transportation and beautify the corridor. LORIS' work included design of a separated multi-use path from Martin Street to Ken Pratt Boulevard. The path was designed to be compatible with the existing drainage patterns of 3rd Avenue and to minimize impacts to the site while also providing the best possible drainage for the path. Modification of an existing vehicular bridge was required to safely carry the path over the Great Western Railway. The contract documents for this project included several bid alternatives to maximize use of the project budget. The project was funded jointly by the City of Longmont and with federal funds acquired through the T21 program.

Client:  City of Longmont



 

     

About Loris | Projects | Contact | Home