|
|
|
|
|
|
| STRUCTURES |
| INFRASTRUCTURES |
| STRUCTURES |
| INFRASTRUCTURES |
| Vehicular |
| Pedestrian |
| Underpass |
| Inspection |
| STRUCTURES |
| INFRASTRUCTURES |
| STRUCTURES |
| INFRASTRUCTURES |
| Corridors |
| Streetscapes |
| Alignment Studies |
| Intersections |
| STRUCTURES |
| Retaining Walls |
| Culverts & Drainage |
| Signage & Identity |
| Skate Parks |
| INFRASTRUCTURES |
| STRUCTURES |
| Recreation & Entertainment |
| Structural Glass & Facades |
| INFRASTRUCTURES |
|
Cherrywood Horizon
High School Prairie Hills Elementary School |
Projects - Infrastructures
Cherrywood Elementary Adams 12 Five-Star School District LORIS provided civil engineering design services for this new 63,000 sq. ft. school, located on approximately seven acres within a 13-acre neighborhood park. In addition, a regional stormwater detention pond had previously been constructed on the site. LORIS engineers worked closely
with the School District, the building architects (Christiansen Reece
Architects), and the City of Thornton to coordinate the overall design
of the site. The resulting design achieves the desired, but somewhat difficult,
objectives of providing a site design that meets the needs of the different
users.
|
|||
|
About Loris | Projects | Contact | Home |
||||
|
|